Advancing a fully permitted gold-silver production project in Québec while unlocking district-scale exploration potential.
ESGold is developing the Montauban Gold-Silver Project, a fully permitted tailings reprocessing operation designed to generate near-term production from historic tailings while advancing exploration across the broader Montauban mining district.
Track ESGold’s share performance across its primary trading markets.
The company trades on the Canadian Securities Exchange (ESAU), the OTCQB (ESAUF), and the Frankfurt Exchange (Z7D).
As ESGold advances the Montauban project toward production and expands its exploration footprint across the district, the company remains committed to transparent and consistent communication with shareholders.
Gold and silver prices play an important role in the economics of the Montauban project.
The 2025 Preliminary Economic Assessment used the following metal price assumptions:
Gold:
US$2,900 per ounce
Silver:
US$32 per ounce
Current market prices remain an important driver of project value and potential future cash flow.
Gold and silver have historically served as monetary metals and stores of value during periods of economic uncertainty.
Demand for these metals is driven by multiple factors including:
Central bank gold accumulation
Industrial demand for silver in electronics & renewable energy
Investment demand during inflationary environments
Precious metals demand as portfolio diversification assets
Projects that combine precious metals production with low-cost operating environments, such as Montauban in Québec, can benefit significantly from strong commodity price environments.
ESGold maintains a focused capital structure designed to support the development of the Montauban Gold-Silver Project while minimizing dilution as the company advances toward production.
110,441,002
38,148,028
2,779,000
151,404,030
Fully permitted project advancing toward production
Tailings-to-cash model enabling near-term revenue
Strong Preliminary Economic Assessment economics
District-scale exploration upside supported by modern geological modelling
Located in one of the world’s top mining jurisdictions
ESGold is advancing the Montauban Gold-Silver Project, a fully permitted tailings reprocessing operation designed to generate near-term production while unlocking district-scale exploration potential.
Together, these factors position ESGold to transition from development into production while maintaining meaningful exploration growth potential.
2026
1,000 tonnes per day
417 claims
206 km²
105% pre-tax
$44.5M pre-tax
ESGold’s development strategy follows a two-phase approach designed to minimize dilution while maximizing project growth potential.
Bring the Montauban tailings operation into production and establish recurring cash flow.
Download the latest investor materials and technical reports.
For investor inquiries, please contact:
ESGold Corp.
Tel: +1 (514) 712-1532
Tel: +1 (888) 370-1059
Discover the Montauban Gold-Silver Project.