Project Details

The Eagle River Property consists of 141 mineral claims (Figure 2.2) located in the north-western limit of

the Mauricie area in the Quebec Province totalling approximately 7,972 hectares. The approximate centre of the Property is located at 464,000m E and 5,420,000mN (from coordinate system WGS84 UTM Zone 18N). The Property is typical of the greenstone-hosted quartz-carbonate (GQC) gold-vein style of deposit and/or the gold-rich volcanogenic massive sulphide (VMS) style of deposit.

 

The central Property area is characterized by a massive to foliated granodiorite to tonalite with massive biotite. In the southern portion of the claim block the area is characterized by a hornblende-biotite-magnetite-rich tonalite which displays foliated to gneissic textures. In the northeastern and eastern portions of the Eagle River Property are small outcroppings of the glomerophyric, massive to pillowed basalts, and massive (and often) vesicular magnetic komatiites of the Archean Lacroix formation as well as massive biotite tonalitic intrusions.

ESGold  Makes Strategic Investment at Windfall Lake – November 29, 2016

ESGold Corp. acquired 77 claims or 4,354 contiguous hectares in the Windfall Lake gold district, Quebec. The Eagle River project is located south of Osisko Mining’s Windfall Lake project and is adjacent to Bonterra Resources Inc.’s Gladiator project in the Urban-Berry area of Quebec.  The Management of ESGold is intimately familiar with the structure of the Windfall Lake project as they developed the mineralization model.  The mineralization structure continues to the south and has been shown to strengthen as it hits Bonterra’s Gladiator project. ESGold ’s newly acquired claims lie directly to the south of these recent discoveries.

 

“ESGold  has taken advantage of this rare acquisition opportunity to acquire the Eagle River claims that lie directly in the path of the known gold mineralization at the Windfall Lake Camp,” stated Brad Kitchen, C.E.O. and Chairman of ESGold  Corp. “This is a strategic investment that will not divert funds from its exploration of the Duvay/Chenier claims but will add additional value for our shareholders as the Windfall Lake area develops.”

 

ESGold Expands its Eagle River Project in the Windfall Lake District of Quebec – February 21, 2017

ESGold  Corp. is pleased to announce it has increased its land position within the Windfall Lake district by acquiring an additional 18 claims or 1,018 contiguous hectares adjacent to ESGold ’s Eagle River project which is on-trend to the Windfall Lake, Urban Barry and the Gladiator gold projects.

 

ESGold  More than Triples the Size of its Eagle River Gold Project, Quebec – March 23, 2017

ESGold  Corp. is very pleased to announce that is has increased its land position within the Windfall Lake district by acquiring 299 claims or 16,500.55 hectares. The majority of the acquisition, 261 claims or 14,369.25 hectares, are adjacent to ESGold ’s Eagle River project which is on a south-east trend to the Windfall Lake, Urban Barry and the Gladiator gold projects. This acquisition has increased the Eagle River Project by approximately 370% from its original size (as per the Company’s November 29th, 2017 news release on the acquisition of the Eagle River project than totaling 4,354 hectares) and brings the Company’s total contiguous land package to 19,778.7 hectares (356 claims).
Please refer to the Eagle River map which details the expansion and location of ESGold ’s Eagle River properties in relation to the current developments in the region. With this acquisition, the Company also acquired three other claim blocks totaling 38 claims (or 2,141.3 hectares) that are strategically located in the western region of the gold camp and are adjacent to Osisko Mining’s Windfall Lake project and Metanor’s Urban-Barry project.

VIDEO GALLERY

DOCUMENTS
REPORTS & PRESENTATIONS